Clements Construction worked a long side PCH Architects to re-instate, two ground floor flats in a block that was suffering from severe subsidence. CCL acted as principal contractor here working closely with our own Ground workers, M&E and building contractors including our own direct labour stay for the internal re-in statements. After a propping design had been provided, CCL propped and braced the building to allow safe removal of 100-150 tonne of aggregate to be removed, and new underpins and piles to be installed.